Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Agbesi, K, Fugar, F D and Adjei-Kumi, T (2018) Modelling the adoption of sustainable procurement in construction organisations. Built Environment Project and Asset Management, 8(05), 461–76.

Bandara, C, Dissanayake, D, Karunasena, G and Madhusanka, N (2018) Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector. Built Environment Project and Asset Management, 8(05), 515–27.

Crippa, J, Boeing, L C, Caparelli, A P A, da Costa, M d R d M M, Scheer, S, Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(05), 491–503.

Dolla, T and Laishram, B S (2018) Procurement of low carbon municipal solid waste infrastructure in India through public-private partnerships. Built Environment Project and Asset Management, 8(05), 449–60.

Pérez, C T and Costa, D (2018) Developing a taxonomy of transportation waste in construction production processes. Built Environment Project and Asset Management, 8(05), 434–48.

Ranawaka, I and Mallawaarachchi, H (2018) A risk-responsive framework for green retrofit projects in Sri Lanka. Built Environment Project and Asset Management, 8(05), 477–90.

Samaraweera, A, Senaratne, S and Sandanayake, Y (2018) Nature of construction project cultures in the public sector: case studies in Sri Lanka. Built Environment Project and Asset Management, 8(05), 557–68.

Victoria, M F and Perera, S (2018) Managing embodied carbon in buildings: a Pareto approach. Built Environment Project and Asset Management, 8(05), 504–14.

Weerasinghe, A S and Ramachandra, T (2018) Economic sustainability of green buildings: a comparative analysis of green vs non-green. Built Environment Project and Asset Management, 8(05), 528–43.

Yumarni, T and Amaratunga, D (2018) Gender mainstreaming as a strategy to achieve sustainable post-disaster reconstruction. Built Environment Project and Asset Management, 8(05), 544–56.